Skip to content
Close Menu
    What's Hot

    The Future of Infrastructure Is Open

    September 13, 2026

    Fact of the Week – 9/14/2026

    September 13, 2026

    Residential Construction at a Crossroads

    September 7, 2026
    Get your Copy Today
    Facebook X (Twitter) YouTube LinkedIn
    Facebook X (Twitter) YouTube LinkedIn
    Connected WorldConnected World
    • SPM
    • Sustainability
    • Projects
    • Technology
    • Constructech
    • Awards
      • Top Products
      • Profiles
    • Living Lab
    Connected WorldConnected World
    Home»Projects»Bridge to Safety
    Projects

    Bridge to Safety

    Updated:March 8, 2022No Comments3 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn WhatsApp Pinterest Email

    Bridges are among the infrastructure elements most in need of maintenance and repair throughout the country. States and cities are moving to obtain funding for repairs and replacement bridges as quickly as money is available from last year’s Infrastructure Bill.

    Work already underway is being expedited where possible and innovative methods are meeting the challenge of maintaining public access while work is being done. As an example, in New Jersey, a modular steel bridge is being used to maintain traffic flow during a section of the NJDOT (New Jersey Dept. of Transportation’s) I-295 Direct Connect project in Camden County.

    The Direct Connect initiative is designed to improve safety and reduce traffic congestion at the intersection of I-295 with I-76 and Route 42 by providing a new direct passage for through traffic on I-295. A safe, reliable temporary detour structure was considered critical to the success of the Browning Road project. In addition to heavy local vehicular traffic, the route provides access to a local school and serves as the main coastal evacuation route for the region.

    A structure developed by Acrow is serving as a detour over a dozen lanes of I-295 and Route 42 during the replacement of the Browning Road Bridge. The bridge replacement is necessary as the roadway below will be widened ahead of the overhead placement of the new core I-295 roadway.

    The two-lane temporary bridge is 450 feet long in two spans of 240 feet and 210 feet, with a roadway width of 24 feet to maintain two-way traffic on Browning Road. There are cantilevered walkways on each side of the structure, one for pedestrians and one to carry utilities. Utilities, which had been carried by the old bridge, needed to be safely and reliably supported by an interim solution to avoid any interruption to critical services such as electric, gas, telecommunications, and water.

    The contractor for this phase of the Direct Connect program is South State, with Dewberry serving as design engineer. It is anticipated the temporary bridge will be in place for two years until completion of the new bridge.

    In addition to increasing safety and convenience for motorists, these critical infrastructure projects are integral to the economic health of the region and play an important role in ensuring roads and bridges can be rapidly and cost-effectively rehabilitated through Accelerated Bridge Construction to save time and money.

    Want to tweet about this article? Use hashtags #construction #sustainability #infrastructure

    Acrow Circularity Constructech Construction Construction News Current Dewberry Economy Legislation Logistics Manufacturing New Jersey DOT Projects South State Supply Chain Sustainability Technology Transportation
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email

    Related Posts

    The Future of Infrastructure Is Open

    September 13, 2026

    Residential Construction at a Crossroads

    September 7, 2026

    Success Stories: Smarter Ag: Protect the Peanuts!

    September 6, 2026

    AI Is Moving to the Factory Floor

    September 1, 2026

    Construction: The Happiest Industry?

    August 31, 2026

    Frontier Firms Rebuild Construction

    August 24, 2026
    Add A Comment

    Comments are closed.

    Peggy Smedley Show on YouTube
    Why Most AI Projects Fail: Solving the Right Business Problems
    https://www.youtube.com/watch?v=Vr_uR9uGas4
    Get Your Copy Today
    ABOUT US

    Connected World works to expand quality of life and influence a sustainable future through digital transformation, innovation, and create opportunities all around.

    We’re accepting new partnerships and radio guests right now.

    Email Us: info@specialtypub.com

    4611 Hard Scrabble Road
    Suite 109-276
    Columbia, SC  29229

     

    Our Picks
    • The Future of Infrastructure Is Open
    • Fact of the Week – 9/14/2026
    • Residential Construction at a Crossroads
    Specialty Publishing Media

    Questions? Please contact us at info@specialtypub.com

    Press Room

    Privacy Policy

    Media Kit – Connected World

    Media Kit – Peggy Smedley Show

    Media Kit – Constructech

    Facebook X (Twitter) YouTube LinkedIn
    © 2026 Connected World.

    Type above and press Enter to search. Press Esc to cancel.