What's Hot

    From Rosie the Riveter to the New Plant Floor

    March 4, 2026

    Here Come the Women in Construction

    March 3, 2026

    A Call for Collaboration in Construction

    March 3, 2026
    Get your Copy Today
    Facebook Twitter Instagram
    Facebook Twitter Instagram
    Connected WorldConnected World
    • SPM
    • Sustainability
    • Projects
    • Technology
    • Constructech
    • Awards
      • Top Products
      • Profiles
    • Living Lab
    Connected WorldConnected World
    Peggy's Blog

    Storytelling with 4D BIM

    Updated:February 16, 2026No Comments4 Mins Read
    Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email
    Share
    Facebook Twitter LinkedIn WhatsApp Pinterest Email

    Certainly, most in the construction industry have heard about BIM (building information modeling) and its 3D, 4D, 5D, and 6D components. All of this is set to evolve with the rise of AI (artificial intelligence), as Fortune Business Insights suggests the global AI in construction market will grow from $4.86 billion in 2025 to $6.02 billion in 2026, and to $35.53 billion by 2034, which is a 24.8% growth rate. Keep in mind, as the technology continues to evolve, the heart of BIM is in the processes surrounding it and in the storytelling that comes with the model.

    This is precisely the conversation I recently had with Morgan Hays, senior director of product management for construction at Bentley Systems. “Ultimately what you’re doing by putting the model and the schedule together is you’re telling this powerful story about what’s happening,” he says.

    A Model Tells a Story

    By creating a 4D model, project teams can expose things that haven’t yet been caught. Consider this example Hays shares: “I’ve seen our customers use 4D planning to significantly reduce staging time by as much as 66%,” he says. “It’s been remarkable. This customer wouldn’t have seen that staging time reduction if they hadn’t been able to watch the project unfold. They’re also able to identify through this time-lapse approach when materials and resources need to be brought to site.”

    Hays also shares an example of a customer building a large train station project. The challenge here is there is only one road in and out of the site. The order they bring the materials to the site is critical because otherwise they end up with delays. However, with a time-lapse 4D model, the customer can easily determine the delivery order for materials, reducing costs.

    Again, the model is all about storytelling and building a visual sequence of events. In another instance, a large airport customer indicated the reason they do 4D planning is to update the owner, since Gantt charts can be confusing. With a model, project teams can tell a detailed story to a non-technical audience. Now that is one powerful story.

    Marriage between Schedule and Model

    Let’s also keep in mind that the technology continues to evolve—and the next evolution will be driven by the integration of reality capture and the model through AI-based technologies.

    “Everybody in our industry knows that the schedule and the model are changing constantly during execution,” says Hays. “The process of keeping the 4D model up-to-date is a significant one. Where we really need to go is to make that process dramatically easier.”

    Consider this: In the United States, the average general contractor uses six reality‑capture technologies, reflecting a significant investment in point‑cloud tools. Right now, those point clouds are being generated by a drone flying around the site, and that information is often siloed. What needs to happen next is to bring this information and integrate it with the 4D model, so it is readily accessible for 4D-based planning.

    This is where AI enters the conversation. Bentley Systems is bringing out the next generation of SYNCHRO this year, which was announced at the Year in Infrastructure event last fall.

    “This is an exciting AI-powered reimagining of how 4D models are built using the latest technology,” he says.

    Hays adds that another key focus is democratizing 4D, which means taking the 4D model creation from a small number of users and making it more accessible to a much larger group of users within a company.

    “The biggest thing that folks should take away is that 4D is being democratized,” says Hays. “It’s going to be available to everyone within the enterprise. It doesn’t require specialized skills, and it is the most powerful storytelling mechanism that you have, whether to internal stakeholders or external stakeholders.”

    Want to tweet about this article? Use hashtags #construction #IoT #sustainability #AI #5G #cloud #edge #futureofwork #infrastructure #BIM #4D #4Dplanning

    4D 5G AI BIM Cloud Construction Edge Featured Future of Work Infrastructure IoT Peggy’s Blog storytelling Sustainability
    Share. Facebook Twitter Pinterest LinkedIn Tumblr WhatsApp Email

    Related Posts

    From Rosie the Riveter to the New Plant Floor

    March 4, 2026

    Here Come the Women in Construction

    March 3, 2026

    A Call for Collaboration in Construction

    March 3, 2026

    Success Stories: Algorithms Advance

    March 2, 2026

    The Quantum Connection

    February 25, 2026

    Utility Infrastructure Advances with AI

    February 24, 2026
    Add A Comment

    Comments are closed.

    Peggy Smedley Show on YouTube
    Inside the Minds of Leaders
    https://youtu.be/6scYLuSQiq8
    Get Your Copy Today
    ABOUT US

    Connected World works to expand quality of life and influence a sustainable future through digital transformation, innovation, and create opportunities all around.

    We’re accepting new partnerships and radio guests right now.

    Email Us: info@specialtypub.com

    4611 Hard Scrabble Road
    Suite 109-276
    Columbia, SC  29229

     

    Our Picks
    • From Rosie the Riveter to the New Plant Floor
    • Here Come the Women in Construction
    • A Call for Collaboration in Construction
    Specialty Publishing Media

    Questions? Please contact us at info@specialtypub.com

    Press Room

    Privacy Policy

    Media Kit – Connected World

    Media Kit – Peggy Smedley Show

    Media Kit – Constructech

    Facebook Twitter Instagram YouTube LinkedIn
    © 2026 Connected World.

    Type above and press Enter to search. Press Esc to cancel.